Skip to content
Indonesia Palm
RBD palm olein RSPO segregated Food

RBD Palm Olein RSPO Segregated

RSPO segregated RBD palm olein IV 54–56 stuffed in dedicated flexitanks from 500 MT for brand-owner food programmes.

  • Physically segregated RSPO SG tankage
  • Dedicated flexitank stuffing from 500 MT
  • Food-grade IV 54–56 with cloud point ≤ 10°C
  • ISO 22000 and Halal (BPJPH) on every parcel

Overview

Physically segregated RBD palm olein for buyers whose audit requires dedicated tankage and RSPO SG certificates. IV 54–56, cloud point ≤ 10°C, flexitank stuffing from Jakarta with ISO 22000 and Halal scopes.

Segregated refining

Oil is processed in RSPO segregated refinery tanks with FFA ≤ 0.1%, IV 54–56, cloud point ≤ 10°C, and Lovibond ≤ 3R. Composite samples are retained against the contract reference.

Who buys segregated olein

Brand owners, retail private label, and food manufacturers under RSPO SG audit requirements who cannot accept mass balance commingling.

Loading

Flexitank 20 ft stuffing at Jakarta tank farms. Lead time three to four weeks to secure segregated tank slot and survey. FOB, CFR, and CIF available.

Product FAQ

MOQ, specifications, certifications, and loading for this SKU.

What is the minimum flexitank order for RSPO segregated palm olein?

500 MT minimum in 20 ft flexitanks with dedicated segregated tank allocation at Jakarta. Larger programmes can book multiple flexitank slots or move to vessel segregated parcels when refinery schedule allows. Segregated tankage carries a premium over mass balance lines.

How does RSPO segregated documentation differ from mass balance on RBD olein?

Segregated oil never commingles with conventional stock in the refinery tank chain. RSPO SG certificate, mill list, and traceability summary name the segregated tank path. Brand audits that prohibit mass balance claims should use this SKU rather than our RSPO MB IV56 line.

What food-grade specs are published on RSPO segregated olein?

FFA ≤ 0.1%, iodine value 54–56, cloud point ≤ 10°C, Lovibond colour ≤ 3R (5¼"). Certificate of analysis is issued before flexitank stuffing. Halal and ISO 22000 scopes attach when ordered on the proforma.

Why is lead time longer on RSPO segregated olein flexitanks?

Segregated tank slots must be booked ahead of conventional allocation and flexitank stuffing is scheduled after composite approval. Typical lead time is three to four weeks from contract versus two to three on mass balance olein. Plan RSPO SG volume quarterly to hold tank reservation.

Request a quote

Share volume, destination, and required certification scope.

Related products

Other lines in the same certification or application band.